Independent Reviews can be populated from a template.
- Independent Reviews follow the standard document workflow
- Enter required content into fields and attach PDFs and/or Stackd documents
- Or a fillable Independent Review PDF form can be populated using Prefilled Templates
Completing an Independent Review will update the I.R. column in the Projects list.
The “Type” is automatically input from the project risk assessment.
Type 1:
The “Reviewer” dropdown list will include all personnel designated as Engineer of Record, this can be managed from Manage Roles & Permissions.
Type 2:
The “Reviewer” dropdown will include all contacts in Stackd.